木工加工棚是我們施工現(xiàn)場的保護(hù)措施,施工現(xiàn)場保護(hù)機(jī)械設(shè)備的可靠運(yùn)行、操作人員不受傷害、干擾所搭設(shè)的操作棚,也是在建筑工地上常用的一種防護(hù)措施。那么木工加工棚的施工要點(diǎn)有哪些?
The woodworking shed is a safety protection measure for our construction site. The operation shed built to protect the reliable operation of machinery and equipment, the operators from injury and interference on the construction site is also a safety protection measure commonly used on the construction site. What are the construction points of woodworking shed?
由于木工加工棚的施工質(zhì)量會對后期使用的產(chǎn)生較大影響,因此,在搭設(shè)木工加工棚的過程中應(yīng)注意以下施工要點(diǎn)。
Since the construction quality of woodworking shed will have a great impact on the safety of later use, the following construction points should be paid attention to during the erection of woodworking shed.
(1)施工前,應(yīng)先編制詳細(xì)的防護(hù)棚施工方案,并在開始施工時(shí)先對防護(hù)棚范圍內(nèi)的兩側(cè)道路進(jìn)行整平、拓寬作業(yè),設(shè)置排水溝,以確保排水暢通,適應(yīng)吊車站位及吊裝。
(1) Before construction, a detailed construction scheme for the protective shed shall be prepared. At the beginning of construction, the roads on both sides of the protective shed shall be leveled and widened, and drainage ditches shall be set to ensure smooth drainage and adapt to the crane station and hoisting.
(2)若木工加工棚的基礎(chǔ)施工范圍內(nèi)光纜、電力線眾多,還應(yīng)制訂光纜、電力線等設(shè)備的改移方案,以及相關(guān)保護(hù)措施,以確保施工和設(shè)備。
(2) If there are many optical cables and power lines within the foundation construction scope of the woodworking processing shed, the relocation scheme of optical cables, power lines and other equipment, as well as relevant protective measures, should also be formulated to ensure construction safety and equipment safety.
(3)木工加工棚施工時(shí),其焊接作業(yè)的過程一定要注意防火,如果有風(fēng)必須設(shè)置好擋風(fēng)板,以免發(fā)生火花飛濺,造成隱患。同時(shí),木工加工棚上不得堆放雜物,以及鋼筋、模板等材料,以防發(fā)生火災(zāi)。
(3) During the construction of the woodworking shed, attention must be paid to fire prevention during the welding operation. If there is wind, the wind deflector must be set up to prevent sparks from splashing and causing potential safety hazards. At the same time, no sundries, reinforcement, formwork and other materials shall be stacked on the woodworking shed to prevent fire.
(4)按木工加工棚的矩型管立桿間距、排距要求進(jìn)行定位放線,并將墊板鋪設(shè)放平穩(wěn),不得懸空。同時(shí),矩型管立桿接長應(yīng)采用對接電焊連接,立桿對接電焊焊接應(yīng)交錯(cuò)布置。
(4) The positioning and setting out shall be carried out according to the requirements for the spacing and row spacing of rectangular pipe poles in the woodworking shed, and the base plate shall be laid stably and shall not be suspended. At the same time, the extension of rectangular pipe upright shall be connected by butt welding, and the butt welding of upright shall be staggered.
(5)木工加工棚棚頂鋪裝施工時(shí),均應(yīng)在既有線上方作業(yè),且須注意高空作業(yè),嚴(yán)禁任何機(jī)具和材料意外掉落損壞線路設(shè)備。同時(shí),應(yīng)通過鋼管立柱,在木工加工棚兩側(cè)設(shè)置接地措施。
(5) When paving the roof of the woodworking shed, work above the existing line, and pay attention to the safety of working at heights. It is strictly forbidden to accidentally drop any machines and materials to damage the line equipment. Meanwhile, grounding measures shall be set on both sides of woodworking shed through steel pipe column.
此外施工完成后進(jìn)行拆除木工加工棚時(shí),其工序應(yīng)與搭設(shè)工序相反,同時(shí),應(yīng)將防護(hù)棚的材料逐個(gè)傳遞到樓層或轉(zhuǎn)料平臺,且不得亂丟亂放。希望對大家有所幫助,關(guān)注我們http://tt9788.com了解更多!
In addition, when removing the woodworking shed after construction, the process shall be opposite to the erection process. At the same time, the materials of the protective shed shall be transferred to the floor or transfer platform one by one, and shall not be scattered. I hope it will help you and pay attention to us http://tt9788.com Learn more!