在加工棚拆除前須進(jìn)行技術(shù)交底!
來(lái)源:http://tt9788.com/ 發(fā)布時(shí)間:2023-02-20
在施工過(guò)程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場(chǎng)廁所需要等都需要搭設(shè)木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保護(hù)建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導(dǎo)致生銹。 木工加工棚搭設(shè)完畢后,須經(jīng)過(guò)專職員驗(yàn)收合格,方可投入使用。在加工棚搭設(shè)和拆除前,須進(jìn)行技術(shù)交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高處作業(yè)人員須經(jīng)過(guò)技術(shù)培訓(xùn)及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術(shù)規(guī)范及有關(guān)標(biāo)準(zhǔn)要求。搭設(shè)和拆除水平木工加工棚時(shí),操作工人的“三寶”須齊備,且應(yīng)正確使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
在木工加工棚搭拆時(shí),應(yīng)避免上下同時(shí)作業(yè),把操作時(shí)間錯(cuò)開。搭拆木工加工棚時(shí),所有材料、工具應(yīng)堆放在建筑物外邊線以內(nèi)少2m,堆碼高度不超過(guò)1m。拆除的材料須傳遞到樓層內(nèi)并及時(shí)運(yùn)走,嚴(yán)禁高空拋擲。搭拆木工加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)護(hù)。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆時(shí),要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對(duì)危險(xiǎn)情況要積極采取有效防護(hù)措施,確保人員。雨天、大風(fēng)天氣,暫停木工加工棚搭拆施工,并應(yīng)檢查維護(hù)木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工過(guò)程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場(chǎng)廁所需要等都需要搭設(shè)木工加工棚。您有需求就來(lái)我們網(wǎng)站http://tt9788.com咨詢吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://tt9788.com Ask!